The eastern end of Perth’s CBD has undergone a significant transformation, driven by the development of the luxurious 5‑star Westin Hotel at 480 Hay Street. This $500 million, 26‑storey project by BGC has become a catalyst for revitalising what was once a tired and overlooked precinct.
Positioned between Hay, Murray and Irwin Streets—just a block from Royal Perth Hospital and close to Victoria Square—The Westin extends the renewed energy created by the nearby State Buildings. The result is a more connected, welcoming and active urban environment, supporting a vibrant 24‑hour hospitality and entertainment precinct.
Set within a tree‑lined heritage pocket, the redevelopment comprises a 26‑storey, 362‑room Westin Hotel alongside a 22‑storey A‑grade office tower. The precinct also features 800 m² of retail and dining space, with the restored Hibernian Hall reimagined as a signature food and beverage destination. Beneath the development, three basement levels provide parking and essential back‑of‑house services to support hotel operations.
As lead architects, Hassell approached the redevelopment of Hibernian Place as a rare opportunity to redefine a significant city landmark. Their design intent focused on drawing people into the precinct and creating a seamless relationship between indoor and outdoor spaces — enhancing the site’s social, economic and cultural value for both the client and the wider community.
A key architectural move was the ‘floating’ hotel ballroom positioned above the restored Hibernian Hall. This strategy created premium event space while enabling a new public plaza beneath, strengthening the precinct’s role as an activated urban destination.
Specialist Engineering Collaboration
The project brought together multiple specialist consultants, each contributing critical expertise to the delivery of this complex, high‑end hospitality precinct. Colliers provided the structural engineering and value‑engineering solutions for the hotel and office tower, while Geoff Hesford Engineering delivered the mechanical services design for the development.
Hera Engineering were engaged as the specialist designers for the post‑tensioned slabs, addressing significant structural challenges including thin slab profiles, large two‑way cantilevers and strict deflection criteria for the façade system. They also developed advanced temporary works solutions to support the fast‑tracked construction program, enabling the site team to achieve ambitious four‑day slab cycles and maintain productivity across multiple levels.
Together, these engineering disciplines ensured the project’s technical performance, constructability and delivery efficiency, supporting the successful realisation of a landmark mixed‑use development.
Key Challenges
Technical Achievements
OpenBIM Leadership
The Westin Hotel development is one of the first projects in Australia to adopt a true OpenBIM approach. It marked a turning point in the industry, demonstrating how coordinated digital delivery could streamline construction and improve outcomes. Watch the video
Draftech’s Involvement
Draftech were engaged to deliver mechanical services modelling and shop detailing for 480 Hay Street — a landmark 5‑star hotel and office development in Perth.
Our scope included the preparation of detailed mechanical shop drawings aligned with design intent, covering HVAC systems, airside and waterside equipment, ductwork, air terminals, and chilled and hot water pipework.
We also developed clear 2D sections, 3D views, schematics and equipment schedules to support delivery on site.
A key part of our role was interdisciplinary coordination — using Navisworks for clash detection and resolution, while providing consistent weekly model updates to keep the project moving forward.
What a privilege it was to be involved in a project where we were able to use our DT workflow and systems to achieve a successful outcome for our client.

Draftech – Your Project, Our Expertise
Want to know more about the luxurious 5‑star Westin Hotel at 480 Hay Street, Perth WA.
https://ghengineering.com.au/project/westin-hotel/
https://www.stantec.com/en/projects/australia-projects/-/480-hay-street-perth-the-westin-hotel
Thanks very much for your support with the As-Built Models. It’s been really refreshing to work with someone as self-sufficient and diligent as you.
Brenton Sonego ADCO
Expedient and efficient drafting with professional-level service.
Philip Finch Envar Engineers
Thank you for all your efforts on our projects; they have been an invaluable contribution to their success. We look forward to working with you on future projects.
Ian Ferguson MPM Group
Jess and Karl at Draftech were amazing. The communication from the start was prompt, and the entire process was extremely easy. We needed their knowledge on Air Schematics, and they had made one up for our buildings that we service. Thanks so much, and we will be using you guys in the future. Cheers, Air Control Australia.
Greg Colebrook AirControl Australia
With Draftech’s thorough understanding of building services modelling and close attention to detail, Forth has been afforded the opportunity to outsource some of our BIM projects with absolute confidence in the accuracy of the final product.
Gary Murdoch Forth Consulting
Very professional and efficient organization. Delivered a great product to a tight deadline.
ACE Power
Karl and the team are very professional and have a vast knowledge of BIM coordination.
Dwayne Willaims Babinda Electrics
We had multiple large projects with tight deadlines and needed a company we could trust. The teams delivery, attention to detail and understanding of what is being designed is always executed to a high standard.
Martin O’Donovan Envar Engineers
Draftech offered a flexible and reliable approach to working collaboratively with our team. They met our expectations and quality requirements and also offered up new ideas.
Draftech have proven to be a valuable and trustworthy resource and we will continue to work with Draftech on other projects.
Simon Marsden Umow Lai
Draftech is different from others in the professionalism and features they provide.
The ability to walk through projects in real time online provides invaluable insight into problem areas and helps provide an efficient resolution on the spot without many phone calls, emails and the necessity for us to paw through countless drawings to understand the issues.
Todd Morris Manager - Air mech
Draftech were put forward to FIP Electrical as the solution to Coordinate, Model, carry out clash detection, provide Electrical Services Shop Drawings, as built documentation and completed electrical model.
Simon Thorpe FIP Electrical
In close collaboration Draftech set up all our systems and model deliverables. In this process Draftech have proven to be a valuable resource for us and demonstrated commitment, understanding and professionalism.
David Skelley DJCoalition
Draftech’s attention to detail and proactive nature throughout the project assisted us in identifying issues before becoming evident on site, saving us both time and unexpected costs.
Matt Payne PJM Engineering Services
They delivered very high quality Revit models and associated 2D documentation at key milestones, working to a tight budget and in strict accordance with the Architects’ BIM requirements.
Peter Thomas Geoff Hesford
We found Draftech’s work to be of high standard and the team delivered exactly as agreed, in fact, when we considered the project complete, Draftech put further resources into the project as they were not satisfied.
John Johnson Beca
Engaging Draftech during design gave us the tools to make smart decisions.
Hansen Yuncken Design Manager - Michael Harkins
The drafting service is timely, reliable and fit for purpose for the built environment.
Peter Harvey Harvey Industries
Draftech stands apart from other drafting services that we have previously used in their attention to detail and ability to adapt to the individual client’s requirements.
Doug Holt McCaig Aircon
I can confidently recommend Draftech as a solid and reliable supplier, and experts in their field. I look forward to working with them again in the near future.
Chris Behan Norman Disney & Young
After seeing the benefits Draftech provided us on the Townsville Hospital Redevelopment we have set up a relationship with Draftech and intend to continue to use their BIM knowledge and skills for our future projects.
Brad Lund Energy Power Systems
Draftech has no competition as they are in a class of their own.
John Boyes Babinda Electrics
Draftech Developments Drafting and Design Capabilities, in conjunction with their outstanding level of Client service and support has provided great solutions to our engineering and Drafting Design portions within our Gorgon Barrow Island Project.
Aaron Hazelton Applied Electro Systems Pty Ltd
Draftech set up necessary systems and workflows very quickly, but also setup auditable estimating and weekly cost tracking processes that we utilised, requiring little maintenance.
TOM PURDON MPM GROUP